§ 4125 Reservoir Water Measurement Requirements
A farmer builds a dam on a river to store water for crops.
The farmer must install special tools to measure how much water flows into and out of the dam. This way, the government can check if the farmer is using the right amount of water and not taking more than allowed.
AI-generated — May contain errors. Not legal advice. Always verify source.
§ 4125 Reservoir Water Measurement Requirements
Last verified: January 23, 2026