§ 1611 Timber Harvesting Plan Requirements
This law says that if a timber harvesting plan includes certain details, it counts as the required notification, and the department must wait to process it until both the plan and the fee are received.
A logging company files a timber harvesting plan that lists how much gravel, sand, and water they will move, the equipment they will use, and shows a map of the site.
Because the plan includes all the required information, the company is considered to have given the legal notification, even though the department hasn't reviewed it yet.
Total material volume = Volume of soil + Volume of sand + Volume of gravel + Volume of boulders
A plan states 120 cubic yards of gravel, 80 cubic yards of sand, and 30 cubic yards of boulders will be removed.
Result: Total volume = 0 + 80 + 120 + 30 = 230 cubic yards
AI-generated — May contain errors. Not legal advice. Always verify source.
§ 1611 Timber Harvesting Plan Requirements
Last verified: January 10, 2026